Magnum Shank 30k for Everest only: Special 1" holes
Designed to work exclusively with Torklift's 30K Weight Distribution system the M9010/M9011 come with 1" holes instead of the industry standard 3/4" (or those of the M9000/M9001).
Drop down shank. Designed to work exclusively with Torklift's 30K Weight Distribution system the M9010/M9011 come with 1" holes instead of the industry standard 3/4" (or those of the M9000/M9001).
Due to the extremely high volume of orders we are regularly experiencing, lead times are longer than expected. All in-stock Torklift products usually ship within 1-3 business days. If you order multiple products, they may ship from different warehouses in separate shipments. EcoHitch products that are not in stock will ship within roughly 12 business days.